ES 01/2018 Statement of Results and Final Determination on Bahamas Power And Light Limited’s Small-Scale Renewable Generation Plan

On 12 December 2016, the Utilities Regulation and Competition Authority (URCA) published a Preliminary Determination and Initial Decision (ES 04/2016) in respect of its Review and Proposed Revision to Bahamas Power and Light Limited’s (BPL) Small-Scale Renewable Generation Plan (SSRG). This document constitutes URCA’s Statement of Results and Final Determination

ECS 02/2018 Final Determination and Order to BTC on Breaches of Retail Pricing Rules

The Utilities Regulation and Competition Authority (“URCA”) has published a Final Determination and Order to the Bahamas Telecommunications Company Ltd. (“BTC”) relating to breaches by BTC of the ex-ante retail pricing rules and other regulatory measures. Copies of URCA’s Final Determination may be downloaded from URCA’s website at www.urcabahamas.bs. It

ECS 27/2017 Consultation on Measures for the Collection and Reporting of Market Data

Today, the Utilities Regulation and Competition Authority (“URCA”) released its Statement of Results and Final Decision on the “Consultation on Measures for the Collection and Reporting of Market Data by Specified Licensees” (ECS 05/2017). The consultation stems from URCA’s authority under sections 8(1)(k) and (I) and section 5 of the Communications

Change of Control with regard to 103.5 FM

The Utilities Regulation and Competition Authority (URCA) makes reference to the Simplified Application Form (with supporting documents) for approval of change in control submitted on 14 February 2017 by Brickell Management Group on behalf of Neman Networks Ltd. (the acquirer) and Messrs. Frank Rutherford and Phillip Smith (the Licensee).  URCA

URCA 05/2017 Final Decision URCA Consultation Procedure Guidelines

This Statement of Results and Final Decision contains the Utilities Regulation and Competition Authority’s (URCA) review and final responses to the written submissions received on the “Draft URCA Consultation Procedure Guidelines” URCA 01/2016 (“The Consultation Document”) issued by URCA on October 13, 2016. URCA as the independent regulator and competition

ES 01/2017 Final Decision on Fees in the Electricity Sector

The Utilities Regulation and Competition Authority (“URCA”) issues this Statement of Results and Final Decision on its “Consultation on: Regulatory Fees for The Electricity Sector in The Bahamas – ES 05/2016” document (“the Consultation Document”) in exercise of its powers under section 38(3)(c) of the Electricity Act, 2015 (“EA”). URCA

ES 03/2017 Regulatory Fees for the Electricity Sector in The Bahamas

The Utilities Regulation and Competition Authority (“URCA”) was appointed under the Electricity Act, 2015 (“EA”) as the independent regulator for the Electricity Sector (“ES”) in The Bahamas. URCA is responsible for licensing persons who generate, transmit, distribute or supply electricity within, into, from or through The Bahamas. URCA’s powers and

ES 02/2017 URCA’s response to BPL SSRG application and interconnection

On 13 December 2016, the Utilities Regulation and Competition Authority (URCA) published an Initial Decision and Preliminary Determination in respect of URCA’s Review and Proposed Revisions to Bahamas Power and Light Limited (BPL)’s Small-Scale Renewable Generation (SSRG) Plan. In that document, URCA made certain decisions regarding the implementation of SSRG

ECS 01/2017 Statement of Results and Final Determination on Mobile Number Portability

The Utilities Regulation and Competition Authority (URCA) today published its Statement of Results and Final Determination on Mobile Number Portability (MNP). On December 14, 2016 URCA issued its Preliminary Determination on the Implementation of Mobile Number Portability in The Bahamas pursuant to Section 80 of the Communications Act, 2009 [ECS

ECS 34/2016 Final Determination on Pricing Rules for Non Price Capped Service

The Utilities Regulation and Competition Authority (URCA) has published its Final Determination and Statement of Results on the “Consultation on Proposed Revision of the Retail Pricing Rules for Price Regulated Services Not Subject to Price Cap Regulation (Non Price Capped Services)” (ECS 34/2016). In this Final Determination, URCA presents its

ES 03/2016 Final Determination on Fees in the Electricity Sector in The Bahamas

Final Determination On Fees For The Electricity Sector In The Bahamas (ES 03/2016) The Utilities Regulation and Competition Authority (URCA) has published its Final Determination On Fees For The Electricity Sector In The Bahamas – ES 03/2016 (the Final Determination) in furtherance to its Preliminary Determination On Fees For The

ECS 19/2016 Statement of Results and Final Determination on RAIO

The Utilities Regulation and Competition Authority (URCA) has published its Final Determination on the amendments to the Bahamas Telecommunications Company Ltd. (BTC) Reference Access and Interconnection Offer (RAIO), issued to BTC on Monday 8 August 2016.

ECS 18/2016 Statement of Results & Final Determination & Order National Roaming Services

On 30 March 2016, the Utilities Regulation and Competition Authority (URCA) issued a public consultation document entitled “Provision of National Roaming Services on the Cellular Mobile Networks of the Bahamas Telecommunications Company Ltd. in The Bahamas to the Second Cellular Mobile Operator for an Interim Period“(ECS 10/2016).1 The consultation considered